Skip to main content

Information sheets

HIA information sheets cover a wide range of industry topics. Prepared by HIA information specialists, they are designed to help HIA members answer questions about a variety of complex areas. You can search by category. Members can also talk to HIA for additional help and support.

Pagination

  • BCA Energy efficiency compliance options (284KB) This item/page is locked

    This information sheet provides an overview of the different BCA compliance pathways for meeting the energy efficiency requirements.

  • BCA Gutter Overflow provisions (322KB) This item/page is locked

    This information sheet provides an overview of the BCA gutter overflow requirements that were introduced in 2016.

  • Determining Bushfire Risk - WA (250KB)

    This information sheet provides an introduction to the considerations to be made when determining bushfire risk in WA

  • Elements of lifecyle assessment (82KB) This item/page is locked

    This information sheet has been prepared to provide members interested in life cycle assessment of buildings and building materials with information on things to consider in an assessment.

  • Energy Verification Reference Building Method (200KB) This item/page is locked

    This information sheet has been developed to provide information regarding applying BCA Verification Method V2.6.2.2

  • Leaving frames exposed to the weather

    Guidance on temporarily bracing of structure to ensure it remains unaffected in the event that you may need to pause the construction of a house for an extended period of time.

  • NCC 2019 Energy Efficiency Requirements - WA

    NCC 2019 energy efficiency changes that was proposed to come into effect this coming May, will be deferred and not apply in WA.

  • NCC 2019 Out of Cycle Amendment – WA

    At the request of Building Ministers, the ABCB has issued an out of cycle amendment to the National Construction Code (NCC) 2019. The amendments are mostly relevant to NCC Volume One (Class 2-9), but there are elements that will affect Class 1 residential buildings; including the additional administrative requirements for Performance Solutions which will result in increased time for approval, costs in development of solutions, and additional red tape particularly for straight forward Performance Solutions for houses.

  • Planning and development amendment bill 2020

    The WA State Government have introduced the first phase of a Planning Reform Bill to Parliament

  • Principles of Life Cycle Assessment (86KB) This item/page is locked

    This information sheet introduces LCA and how it can be used as a decision making tool for the assessment of building products, when the builder or owner is interested in considering the overall environmental impact of a building.