Enter your email and password to sign in
Did you become a member online? If not, you will need to activate your account to login.
If you are having problems logging in, please call HIA helpdesk on 1300 650 620 during business hours.
If you are having problems logging in, please call HIA helpdesk on 1300 650 620 during business hours.
Enter details below and sign up
Rising interest rates can cause building commencements to slow within six months, but in this cycle, the lag will be significantly longer.
“Rising interest rates can cause building commencements to slow within six months, but in this cycle, the lag will be significantly longer,” stated HIA Regional Executive Director, Fiona Nield.
HIA is deeply saddened by the loss of housing industry leader Mario Biasin
HIA respond to proposed amendments that would change current arrangements to account for value of land held interstate when assessing land tax liability.
Rising interest rates can cause building commencements to slow within six months, but in this cycle, the lag will be significantly longer.
“Rising interest rates can cause building commencements to slow within six months, but in this cycle, the lag will be significantly longer,” stated HIA Regional Executive Director, Fiona Nield.
A SWMS is a document that sets out the High risk construction work (HRCW) activities to be carried out at a workplace, the hazards arising from these activities and the measures to be put in place to control the risks to health and safety.
Using AS 3727.1 will minimise any potential pavement cracking and movement and your pavement is fit for purposed.