{{ propApi.searchIcon }}
{{ propApi.closeIcon }}
Our industry
Our industry $vuetify.icons.faArrowRight
Housing industry insights Economics Insights Data & forecasts Tailored research & analysis Advocacy & policy Advocacy Policy priorities Position statements Submissions News & inspiration Industry news Member alerts Media releases HOUSING Online
Business support
Business support $vuetify.icons.faArrowRight
For your business Contracts Online Safety systems & solutions Advertise jobs HIA SafeScan Member perks Toyota vehicles The Good Guys Commercial Ampol fuel savings See all Industry insurance HIA Insurance Services Construction works insurance Home warranty insurance Tradies & tool insurance Apprentices Why host a HIA apprentice? Hire an apprentice Support & guidance Contracts & compliance support Building & planning services
Resources & advice
Resources & advice $vuetify.icons.faArrowRight
Building it right Building codes Australian standards Getting it right on site See all Building materials & products Concrete, bricks & walls Getting products approved Use the right products for the job See all Managing your business Dealing with contracts Handling disputes Managing your employees See all Managing your safety Safety rules Working with silica See all Building your business Growing your business Communication for your business See all Other subjects Getting approval to build Sustainable homes See all
Careers & learning
Careers & learning $vuetify.icons.faArrowRight
A rewarding career Become an apprentice Apprenticeships on offer How do I apply? Frequently asked questions Study with us Find a course to suit you Qualification courses Learning on demand Professional development courses A job in the industry Get your builder's licence Continuing Professional Development (CPD) Further your career Find jobs
HIA community
HIA community $vuetify.icons.faArrowRight
Join HIA Sign me up How do I become a member? What's in it for me? Mates rates Our podcasts Made To Build Built Different HIA Building Australia Building the Hunter Our initiatives HIA Building Women GreenSmart Kitchen, bathroom & design hub Get involved Become an award judge Join a committee Partner with us Support for you Charitable Foundation Mental health program Get to know us Our members Our people
Awards & events
Awards & events $vuetify.icons.faArrowRight
Awards Awards program People & Business Awards GreenSmart Australian Housing Awards Awards winners Regional Award winners Australian Housing Award winners 2025 Australian Home of the Year Enter online Industry events Events in the next month Economic outlook National Conference Events calendar
HIA shop
HIA shop $vuetify.icons.faArrowRight
Most popular products National Construction Code Vol 1 & 2 Waterproofing wet areas AS 3740:2021 HIA Guide to Waterproofing HIA Guide to NCC Livable Housing Provisions Top categories Building codes & standards Contracts & documents Guides & manuals Safety products Signage For your business Contracts Online Digital Australian Standards Digital Resource Library Forecasts & data
About Contact Newsroom
$vuetify.icons.faTimes
$vuetify.icons.faMapMarker Set my location Use the field below to update your location
Address
Change location
{{propApi.title}}
{{propApi.text}} {{region}} Change location
{{propApi.title}}
{{propApi.successMessage}} {{region}} Change location

$vuetify.icons.faPhone1300 650 620

Tasmania adopts next stage of Livable Housing Design provisions

The Tasmanian Government has confirmed it will proceed with implementing the next phase of the current Livable Housing Design requirements from 1 October 2025.

A Tasmanian Director’s Determination regarding the application of Part H8 (Livable Housing provisions) of the NCC states that internal doors, corridors, and sanitary compartments in new building work are to comply with the Livable Housing Design requirements from 1 October 2025. This is in addition to the requirements of Part H8 introduced on 1 October 2024. They include:

  • Part 2.1 (clear opening width); and  
  • Part 5 (shower); and  
  • Part 6 (reinforcing of bathroom and sanitary compartment walls).

From 1 October 2025:

  • Part 3 (internal doors and corridors); and 
  • Part 4 (sanitary compartment) if there are no habitable rooms located on that level; but excluding the requirement for installation of a sanitary compartment on the ground or entry level of a Class 1a building. 

The building work will then comply with all the performance requirements of Part H8.

What do these provisions of the ABCB Livable Housing Design Standard require? 

Internal doors

Internal doorways must provide a minimum clear opening width of 820 mm. Doorways subject to the provisions are those that connect to, or are in the path of travel to, any of the following:

  • a habitable room or laundry on the ground or entry level. 
  • an attached Class 10a garage or carport that forms part of an access path required by Clause 1.1. 
  • a sanitary compartment on the ground or entry level complying with Parts 4 and 6. 
  • a room containing a shower complying with Parts 5 and 6.

A habitable room is defined as a bedroom, living room, lounge room, music room, television room, kitchen, dining room, sewing room, study, playroom, family room, home theatre and sunroom. These provisions do not apply to stairways.

Thresholds

The threshold of those internal doorways listed above must:

  • be level; or 
  • have a height not more than 5 mm if the lip is rounded or bevelled; or 
  • have a ramped threshold that does not does not extend beyond the face of the depth of the door jamb; and  
  • has a gradient not steeper than 1:8 and is at least as wide as the minimum clear opening width of the doorway it serves. 
Compliant threshold of internal doorways

Internal corridors, hallways and passageways

Where a corridor hallway passage is connected to an internal door, it must have a minimum clear width of 1000 mm, measured between the finished surfaces of opposing walls.

It is important to note this measurement is taken between linings. When designing the corridors, hallways, etc. the additional width of the lining must be considered in the overall dimensions on the plans / working drawings to ensure the minimum 1000 mm is maintained.

For example, the minimum width of a corridor shown on a plan would need to be minimum 1020 mm to allow for 10 mm plasterboard linings if 10 mm plasterboard lining is used. You must also allow for where plaster may build up at internal corners for the internal join. These may create a clear width less than 1000 mm.

Any skirting boards, architraves, timber mouldings, skirting tiles, door stops, conduits, general power outlets, etc. may encroach into the 1000 mm clear space.

Note: there are no tolerances applicable in the Livable Housing Design Standard. 

Sanitary compartments

There must be at least one sanitary compartment located on the ground or entry level of a dwelling. The Director’s Determination makes clear this obligation would not require the installation of a sanitary compartment on a level that does not contain habitable rooms.

Sanitary compartments complying with this section also need to provide:

  • Adequate circulation space of 1200 mm x 900 mm from the front edge of the sanitary pan; and  
  • Minimum width of the compartment 900 mm (measured between finished surface of linings); and 
  • Where the toilet pan is within a room with other fixtures, the side of a vanity or other obstruction (e.g. bath) needs to be at least 450 mm from the centreline of the toilet pan.
Share with your network:
More articles on:
{{ tag.label }} {{ tag.label }} $vuetify.icons.faTimes
Find the latest expert advice, guides and much more!

Building it right topics


Can’t find what you need, check out other resources that might be closer to the mark.